Installation
• Prepare a hole approximately 12" in diameter and 22" deep.
• Place a bed of gravel or small rock in the hole.
• Place the sleeve in the hole.
• Place gravel or small rock in and around the sleeve to a height of 2" from the bottom of the sleeve. This will help drainage.
• Pour concrete or cement around the sleeve, be careful not to get any inside of the sleeve.
• Fill the hole approximately 1" from the ground level with the concrete.
• Place the flag pole in the sleeve and level the flagpole from two sides.
• When the sleeve is level, carefully remove the flagpole with out moving the position of the ground sleeve.
• Let the concrete or cement set for at least 24hours.
• Place pole in the sleeve and erect.
• Raising the pole-pull each section up slowly twist until it automatically locks in position starting from the top inner section.
• Lowering the pole - Hold on to the section to be lowered. Press the locking button to release, twist, and allow the section to slide down slowly through the hands.
• Insert the pole into the ground sleeve.